The first 2 pictures were taken 5/31 and 6/03, of the left front half of the house.
Half the plywood was done Friday, it's all done on the front section of the house Monday.
6/04, Tuesday, half the left side was done.
6/05, Left side plywood done, and start of indent under the hot tub deck on Wednesday.
6/06, Thursday, under hot tub deck done, working on the back of the house.
6/07, Friday, back plywood done, except around the top deck. A little of the right side done.
6/08, Saturday, right side plywood done. Wednesday it was 100+. Saturday only 70s. Nicer work weather.
This is the left side of the front of the house.
Friday half of the plywood was done.
On Monday, the rest of the side was done.
There's a little bit around the corner, but not enough to worry about.
Monday, and the plywood on the front of the house is complete.
Tuesday, half of the left side of the house has plywood on it.
Wednesday, all of the left side of the house has plywood on it, and
Plywood just started on the indent below the hot tub deck,
Thursday, 6/6, the section under the hot tub deck is pretty much done.
And some of the back of the house.
Friday, 6/7, plywood complete on the back of the house, except over the top decks.
A little of the plywood on the right side of the house is up.
Saturday, 6/8, all the plywood on the right side of the house is up.
Looking at the top front of the house, there are 2 small sections. Both were done today.
I think the only plywood remaining is the main deck in back of the house.