Scaffolding is all up, and some of the siding is off. Quite a job.

They've been working, maybe a week. Setting up the scaffolding took 2-3 days at least. But it's up, all around the house. This is the first time I've walked around the house to take pictures. It's steep and slippery, and not fun at all. And the scaffolding has been set up over the stairs on both sides. But it will be nice to have some record.

Now on to the pictures.

Set up scaffolding all around the house. Remove the old siding. This is the left side of the front of the house with siding removed, and scaffolding in place.

This is the back of the house with the scaffolding around the entire house.

5/21, got pictures all around the house. This is the front half of the left side.

More of the left side. You can see well into the house.

Larger view of the left side of the house, with scaffolding all around it.

The back of the left side of the house is cut away to some degree, under 2 decks.

Looking at the back of the house, the cut out is on the right.

This is the entire back of the house. There's no scaffolding where there are decks.

Back to the front of the house, you can see under the house.

On the right side of the house, there's scaffolding, but not any other work yet.

On the right side, there's PG&E, electric, gas, water, solar panels, and internet. Don't know how they'll deal with those.

The large dumpster is getting pretty full. And they're only half way around the house.